clintonracing
something witty
During the discussion of T2 being repaved last year, there were some comments about Pacific wanting to repave T8 this winter.
Anyone have any insight into whether Pacific is still consdering a repave of that part of the track soon?
Anyone have any insight into whether Pacific is still consdering a repave of that part of the track soon?
Last edited: